Home » today » News » Works in Campo Grande will have an effect on the Inexperienced and Yellow traces from 3 August. See the situations and alternate options – Govt Digest

Works in Campo Grande will have an effect on the Inexperienced and Yellow traces from 3 August. See the situations and alternate options – Govt Digest

The Lisbon Metro is about to start an important part of its modernization and enlargement work, with the implementation of main modifications to the service between August 3 and 19. These interventions are a part of community enlargement initiatives, together with the creation of the “Round Line”, which goals to extend the frequency of trains and enhance the effectivity of the transport community within the Lisbon metropolitan space.

Within the interval between August third and nineteenth, work will probably be carried out on the Campo Grande station, which can have an effect on the Inexperienced and Yellow traces. In a press release, the corporate explains that these interventions are vital for the development of the brand new round line, which can lengthen the Yellow and Inexperienced traces, join Rato and Cais do Sodré stations, and characterize an important funding for higher mobility within the metropolis. space

Subsequently, take note of the next conditions:

  • Between third and seventeenth August:
    • Telheiras station, on the Inexperienced line, and the connection from Campo Grande station to Cidade Universitária, on the yellow line, will probably be closed.
    • The Inexperienced line operates between Campo Grande and Cais do Sodré, with trains of 6 automobiles. Between August 14 and 17, the road operates with 3-car trains.
    • The yellow line runs between Cidade Universitária and Rato with 6-car trains, and Odivelas and Campo Grande stations have 3-car trains.
  • Between 18 and 19 August:
    • Campo Grande station will probably be closed to the general public.
    • The circulation of the Inexperienced line between Telheiras and Alvalade will probably be suspended.
    • The circulation of the Yellow line between Lumiar and Cidade Universitária will probably be suspended.
    • The yellow line runs between Odivelas/Lumiar and Cidade Universitária/Rato with 6-car trains.
    • The Inexperienced line operates between Alvalade and Cais do Sodré, with trains of 6 automobiles.

Service on the Inexperienced and Yellow traces is anticipated to start at 6:30 a.m. on August 20.

Mitigation measures and alternate options

To attenuate the affect on passengers, Metropolitano de Lisboa will take the next measures:

  • Improve in prepare frequency: On the Inexperienced line, to scale back passenger ready instances.
  • Personnel Strengthening: Elevated staffing at affected stations, in addition to monitoring and safety providers.
  • Different Street Service:
    • Between Telheiras and Campo Grande and between Telheiras and Alvalade/Lumiar/Cidade Universitária.
    • A bus service marked “shuttle” will probably be accessible between the next factors:
      • From 3 to 17 August: From 7:30 am to eight:00 pm.
        • Telheiras (Rua Prof. Eduardo Araújo Coelho) – Campo Grande (Rua Cipriano Dourado).
        • Campo Grande (Rua Actor António Silva) – Telheiras (Rua Prof. Fernando da Fonseca).
      • On August 18 and 19:
        • Telheiras – Campo Grande – Alvalade.
        • Lumiar – Quinta das Conchas – Campo Grande – Cidade Universitária.
  • Strengthening the supply with Carris: A proposal to make use of the next Carris routes to enhance the transport community:
    • Telheiras – Campo Grande – Alvalade axis:
      • Line 747, 767, 778, 43B and 44B.
    • College Metropolis – Campo Grande Axis:
    • Entre Campos / College Metropolis Axis – Lumiar:
    • Campo Grande – Lumiar Axis:
      • Line 717, 747, 796, 798, 43B and 44B.

Message from Metro Lisbon

Metropolitano de Lisboa wish to thank the shoppers for his or her understanding throughout this work interval and emphasizes that ongoing initiatives are important to supply a extra environment friendly and sustainable public transport community. These efforts additionally goal to contribute to the nationwide goal for decarbonisation by 2050.

2024-07-26 15:01:26


#Works #Campo #Grande #have an effect on #Inexperienced #Yellow #traces #August #situations #alternate options #Govt #Digest

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.