Home » News » Work on the Altabix neighborhood collector is finished | Radio Elche

Work on the Altabix neighborhood collector is finished | Radio Elche

The city council and Aigües d’Elx continue with the renovation and updating plan of the drinking water and sewerage network and the expansion works of the collector in the Altabix neighborhood. This action has been carried out in the Fra Pere Balaguer and Obispo Winiba streetsHe and they have supposed a investment of 615,665 euros.

The works allow the connection with the collector that is in the Los Palmerales neighborhood and Ciudad Jardín, installed in 2015, and represents an improvement in the collection of Rainwater. In addition, it will produce relief in the ravine of San Antón, which was affected by the heavy rains

The mayor of Elche, Carlos González, has indicated that this action represents multiply by five the drainage capacity collector. González has assured that they have also taken the opportunity to replace 200 square meters of sidewalks and to carry out a performance of improvement of the asphalting of 4,500 square meters of surface.


Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.