After the storm, several streets in the Las Chacras area suffered a serious deterioration and are still not repaired, while the Ministry of Infrastructure and Civil Works of the Province is working on repairing the Camino de la Virgen, which presents serious inconveniences due to the Intense traffic that is registered by this pass when the Presidente Castillo avenue in Tres Puentes is cut off, where a roundabout is executed to enter the Municipal Parador and a tunnel that connects the north and south coasts in the new road layout that is built at the vera del Valle river.
For several days this media has been reporting on the deplorable state of this road and those that are taken as detours on the waterfront.
To the complexity of circulating through the streets of the downtown area of Valle Viejo, there is another important artery where traffic is interrupted by the sinking of the asphalt.
It is Eulalia Ares de Vildoza street, which connects the center of San Isidro with Plaza El Aborigen, where a large number of businesses of different types and private homes are located, and where a large traffic flow is usually registered.
As it was known, work is being done at the site to repair the subsidence that was produced by the poor compaction of the surface, after the chaos for the sewer network was placed in the sector. On the other hand, there were an increase in complaints about the state of detours due to the traffic cut on Avenida Presidente Castillo in Tres Puentes, where a roundabout and a tunnel are made.
–