Home » News » UMBAL Burgas Cuts Energy Costs with New Photovoltaic System by 2025

UMBAL Burgas Cuts Energy Costs with New Photovoltaic System by 2025

UMBAL Burgas Leads the Way‌ in Energy ⁤Efficiency and Patient Care Improvements

UMBAL Burgas has taken a monumental leap forward in enhancing both its energy efficiency and the quality of care for patients and staff. Through a groundbreaking energy efficiency project funded ⁤by the Ministry of Health, the hospital has successfully ‍implemented two major repair‌ activities, totaling nearly BGN 10 million. These initiatives not onyl reduce operational costs but also ⁢position UMBAL Burgas as a leader in enduring healthcare practices.

The first phase of the project focused on‍ the ‌design and implementation ​of thermal insulation for the exterior walls, floors, and⁢ roofs of all⁤ hospital buildings. This upgrade has significantly minimized heat ⁣loss during the​ winter months, leading to substantial savings⁣ in heating costs. Additionally, the hospital’s⁤ exterior has been revitalized, improving its aesthetic appeal.

The second phase introduced a state-of-the-art photovoltaic system, transforming the hospital into a self-sufficient energy hub. Solar panels installed on the rooftops⁣ now generate electricity and⁤ produce hot water for the hospital’s needs.Thanks to the building’s prime location ‌and abundant sunlight, the system has already demonstrated ⁤a ‌noticeable reduction in electricity costs.

This project is part‌ of UMBAL Burgas’s ongoing commitment to energy efficiency and resilience. Six years ago,the hospital built its own oxygen installation,extracting ⁢oxygen from atmospheric air for medical use. This innovation has eliminated reliance on external suppliers, saving meaningful financial resources and ensuring uninterrupted patient care.in addition to these energy-focused upgrades, the hospital has completed⁤ renovations in its Emergency Department. All offices have been modernized, and new equipment—including carts, tables, tools, and​ training posters—has been installed to enhance the ​working environment ⁢for specialists and trainees.

Key Highlights of UMBAL Burgas’s Energy Efficiency Project

| Aspect | details ⁤ ⁣ ​ ‌ ⁣ ⁤ ⁤ ⁣ |
|————————–|—————————————————————————–|⁣
| Thermal Insulation ‌ ‌ | Exterior walls, floors, and roofs insulated to ​reduce heat loss and costs. |
| Photovoltaic System | Solar‍ panels generate electricity and hot water, cutting energy expenses.|
| Oxygen Installation | ⁣on-site oxygen production ensures independence from external suppliers. |
| Emergency Department | Renovated offices and new equipment improve⁢ functionality and training. |

UMBAL Burgas’s innovative approach to energy efficiency and patient care sets⁤ a new standard for hospitals nationwide. By harnessing renewable energy and investing in critical infrastructure, the hospital is not only reducing its environmental footprint but also ensuring a sustainable future for healthcare delivery. ​

For more insights into how hospitals are leveraging renewable ⁢energy, explore this study on interventions⁢ for increasing energy ⁢efficiency in hospitals.

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.