Home » today » News » traffic jams on the Caen ring road

traffic jams on the Caen ring road

Attention traffic jams on the Caen ring road! Probably even more than usual from Tuesday September 21. Repairs to the Calix viaduct, victim of cracks, are entering a new phase: the right-hand lanes will be neutralized and the speed lowered to 50 km / h.

To view this Twitter content, you must accept cookies Social Networks.

These cookies make it possible to share or react directly on the social networks to which you are connected or to integrate content initially posted on these social networks. They also allow social networks to use your visits to our sites and applications for personalization and targeting advertising.

Manage my choices

These restrictions will be in effect throughout the work, until November 15. Before that, the viaduct will be closed in the Cherbourg-Paris direction at night from September 20 to 21 and in the Paris-Cherbourg direction at night from 22 to 23 September to set up signage.

However, this work is essential to consolidate the work. HGVs over 3.5 tonnes have already been banned from passage since the end of June. But for other users, it is worry. On social networks, many predict big traffic jams, already visible when both lanes are open.

Viaduct, North ring road and A13 … Lots of work at the same time

The news is combined with the disruptions caused by the securing of the northern ring road and the new phase of work on the A13, between Dozulé and Pont l’Evêque. The teams of the Société des Autoroutes Paris – Normandie (SAPN) are carrying out the asphalt and the draining concrete for the new roadway.

After having carried out the operation in the direction Paris – Caen until last week, it is necessary to do the same in the other direction. The A13 will be closed from 9 p.m. Monday to Tuesday night, then Tuesday to Wednesday night. The constraints will be reduced thereafter, even if every evening, from 7 p.m. until around 7 a.m. the next morning, the tracks will be closed between Dozulé and Pont l’Evêque and traffic will be shifted to the other side.

No need to leave the highway even if the speed will be reduced. This phase will end at the end of October / beginning of November. The management of the site wants to advance as much as possible before winter to get closer, finally to the end of this interminable site.

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.