City of Bern | 13 August 2024
The tram tracks between Brunnenhof and Fischermätteli in Bern are to be replaced. At the same time, further work is planned on water and utility lines, bus stops and the street space itself. The project will be on public display from August 19 to September 17.
The tram tracks of the Bern city line six need to be renewed between the Brunnenhof and the Fischermätteli.Photo: Bernmobil
The project is essentially approved via a so-called railway planning approval procedure at federal level. This has now completed the preliminary review, as the city and canton of Bern, the transport company Bernmobil and the municipal energy supplier ewb announced on Monday.
The total cost of the construction project is around 42.6 million Swiss francs. The city of Bern will contribute 15.7 million Swiss francs. Voters will vote on the matter next September.
If the ballot box results in a yes, construction work is expected to begin in 2026, the statement continues.
A cantonal building permit is required for the renovation and redesign of Veieliplatz and Munzinterplätzli planned by the city of Bern. The projects will also be made publicly available soon.