Home » News » Tihomir Yanakiev: The repair of the bridge over the Ravadinska River was completed 25 days earlier – 2024-04-15 09:43:18

Tihomir Yanakiev: The repair of the bridge over the Ravadinska River was completed 25 days earlier – 2024-04-15 09:43:18

The repair of the bridge over the Ravadinska River was completed 25 days earlier. The Mayor of the Municipality of Sozopol, Tihomir Yanakiev, signed act 15 today, by which the object is provided for the use of the municipality. It is already in use.

Father Dimitar inaugurated the new facility in the presence of the mayor Yanakiev, the mayor of the village of Ravadinovo Ivan Pazvantov, the chairman of the municipal council Stanimir Andonov, municipal councilors and citizens.

He wished a safe journey to all who pass by him.

“Thanks to everyone involved in building the bridge! It used to be a waterfall, but now it is a bridge that will guarantee the trouble-free passage of the residents and guests of the village of Ravadinovo, regardless of the weather conditions. It was a promise to the people of the village that we are fulfilling, and much earlier than expected.

There are many more projects to come for the village of Ravadinovo. All streets will be asphalted within a year and a half. We are designing and we are already at the end of the procedures for the new reservoir of the village. This is a serious project for the village, which will solve a big problem. These are the two priorities for Ravadinovo, plus the bypass. These three projects will cost around BGN 11-12 million. and I think that the residents of the village of Ravadinovo should be satisfied. This is what the mayor of Sozopol Municipality Tihomir Yanakiev said.

“I am extremely happy that we can now say goodbye to the new bridge. Mayor Yanakiev and I have been here many times during disasters when the road was flooded. The pipes that were there before could not take the water. I thank everyone for their work and patience.” The mayor of Ravadinovo, Ivan Pazvantov, also shared.

The building permit for the reconstruction came into force at the end of September 2023. The construction works started in January and were supposed to finish on 05/09/2024.

As Mayor Yanakiev promised, the repaired bridge is a fact almost a month earlier and can now be used by citizens safely.

The previous construction of the bridge had two pipes that could not ensure the conductivity of the water even with average amounts of rainfall.

During more intense rainfall, the areas adjacent to the river, the roadway, the private properties nearby, as well as the “Neptune” water park, were flooded. During periods of flooding, access to the village of Ravadinovo became difficult.

The last flooding of the spillway area was documented on January 13, 2021.

The purpose of the repair was to improve the structural and operational characteristics of the road facility, which would improve the drainage and safety of vehicular and pedestrian traffic, the durability of the entire facility and the road in its section, to reduce the operating costs of its maintenance, as well as the construction of the facility to be brought into a form that meets modern national and European norms and standards for this type of facilities.

The section is 120m long – part of municipal road BGS 1211 /II-99, Chernomorets – Sozopol – Ravadinovo/. Until the repair, it had two traffic lanes of 2.50 m, a bank on the left – 1 m. and a banquette on the right – 1.50 m.

Now the roadway is 2 lanes of 3.50 m., sidewalks, separated by a guardrail, on the left and right by 2 meters. A completely new traffic signal with horizontal road markings was made.

The value of the project is BGN 767,212.63.

#Tihomir #Yanakiev #repair #bridge #Ravadinska #River #completed #days #earlier

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.