Home » News » StorieTravaux, 05/30/21 – Series of disruptions on the A10 and A85 Info Tours.fr news from Info Tours.fr

StorieTravaux, 05/30/21 – Series of disruptions on the A10 and A85 Info Tours.fr news from Info Tours.fr

And also construction sites in Tours and St-Cyr.

Each weekend with the StorieTravaux Info Tours takes stock of the new projects brought to our attention to help you get around.

—————-

A10:

Until June 11 at 4 p.m., day and night: closure of the slip road from Bordeaux (A10) and towards Angers (A85) + closure of the slip road from Bordeaux (A10) and towards Vierzon ( A85). Follow the deviations set up on the local network.

The night of Monday May 31 to Tuesday June 1: from 10 p.m. to 6 a.m .: Closure of the motorway section between the Châtellerault-Nord interchanges (n ° 26) and Sainte-Maure-de-Touraine (n ° 25) from Bordeaux and towards Paris. Mandatory exit at the Châtellerault-Nord interchange (n ° 26). Follow the deviations set up on the local network.

From 6 p.m. to 6 a.m .: Closure of the “Châtellerault-Usseau” service area.

From Monday May 31 at 11 a.m. to Thursday June 3 at 11 a.m., day and night: risk of slowing down between the Joué-Lès-Tours (n ° 24) and Monts-Sorigny (n ° 24.1) interchanges.

For 3 nights (Monday May 31, Tuesday June 1 and Wednesday June 2), from 8 p.m. to 7 a.m.: closing of the entrance ramp to the Saint-Avertin interchange (n ° 22), towards Paris. Follow the deviations set up on the local network.

The night of Thursday June 3 to Friday June 4, from 8 p.m. to 7 a.m .: closing of the exit ramp of the Saint-Avertin interchange (n ° 22), coming from Paris. Follow the deviations set up on the local network.

A85 :

Until June 11 at 4 p.m., day and night: closure of the slip road from Bordeaux (A10) and towards Angers (A85). Closure of the slip road from Bordeaux (A10) and towards Vierzon (A85). Follow the deviations set up on the local network.

For 3 nights (Tuesday 1, Wednesday 2 and Thursday 3 June), from 8 p.m. to 6 a.m .: closing of the exit ramp for the Langeais interchange (n ° 7), coming from Tours. Follow the deviations set up on the local network.

Tours :

In addition to the work in progress until the end of August in the south of the Rotonde, a construction site is starting on the sidewalk on the even side of Rue Edouard Vaillant, between N ° 96 and 122. They will last 4 weeks from Tuesday. Access to shops maintained, pedestrian traffic diverted, no change for cars.

Work with consequences on the Fil Bleu network:

Due to road works on rue de la Chanterie in St-Cyr-sur-Loire, the Chanterie stop is not served by line 73 (direction Jean Jaurès), only Tuesday and Wednesday. You should refer to the Engerand stop, located Boulevard Charles de Gaulle.

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.