Home » Business » Spend IDR 56 T, Gedebage-Cilacap Toll Road Becomes the Longest in RI

Spend IDR 56 T, Gedebage-Cilacap Toll Road Becomes the Longest in RI

Jakarta

The Gedebage-Tasikmalaya-Cilacap toll road will soon be built. With a total length of 206.65 km, the toll road which will connect West Java with Central Java is the longest toll road in Indonesia so far after the Padang-Pekanbaru toll road of 254.8 km, which is currently still under construction.

The Toll Road Regulatory Agency (BPJT) has determined the winner of the toll road concession auction with an investment value of Rp 56 trillion. The winners consisted of a consortium of PT Jasa Marga (Persero) Tbk, PT Daya Mulia Turangga-PT Sarana-PT Gama Group, PT Pembangunan Perumahan (Persero) Tbk, PT Waskita Karya (Persero) Tbk, and PT Wijaya Karya (Persero) Tbk.

The construction and operation of the Gedebage-Tasikmalaya-Cilacap toll road is divided into two parts, namely stage 1 Gedebage-Tasikmalaya and stage 2 Tasikmalaya-Cilacap. Phase 1 construction will be carried out in 2022-2024. Then phase 2 will be continued in 2027-2029. This means that there will be a gap in operation of about 3 years.

“With the pause in the construction schedule, the financial close for this toll road investment can be carried out twice, namely the need for the Gedebage-Tasikmalaya segment first then Tasikmalaya-Cilacap,” said Member of BPJT Professional Element Koentjahjo Pamboedi, quoted from BPJT’s official statement, Thursday (6/6). /1/2022).

Meanwhile, the President Director of PT Jasa Marga (Persero) Tbk, Subakti Syukur, representing the winning consortium, expressed his deepest gratitude during the auction process for the Gedebage-Tasikmalaya-Cilacap Toll Road.

“Of course, all of us consortium are very committed to completing this fairly long toll road, as expected, it can run smoothly and according to the expected results. Hopefully this project will become one of the segments that plays an important role in breaking up traffic flow. future congestion in the area from Gedebage to Cilacap,” he concluded.

The Gedebage-Tasikmalaya-Cilacap Toll Road will have 10 Interchanges (SS), namely SS Majalaya, SS Nagrek, SS Garut Utara, SS Garut Selatan, SS Singaparna, SS Tasikmalaya, SS Ciamis, SS Banjar, SS Patimuan, and SS Cilacap.

Watch Video: Km 149 Interchange Hasn’t Been Activated, Walkot Bandung: Coming Soon

[Gambas:Video 20detik]

(eds/eds)

– .

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.