Up to date 17/05/2024
The presence of allergenic and doubtlessly pathogenic molds has led the Gironde Prefecture, along side the Regional Council, the Tutorial Directorate of Nationwide Training Providers and the Regional Well being Company, to challenge a preventive closure order despatched out for school right this moment with Lacanau.
After infiltration was noticed in a number of areas of the constructing, analyzes carried out within the air and on the surfaces of a number of rooms of the school revealed fungal contamination associated to mould.
To remove well being dangers, the school have to be completely disinfected. This remedy of the constructing just isn’t appropriate with the presence of scholars or workers and subsequently doesn’t permit the continuation of instructing actions on the location.
That’s the reason, with the advice of the educational director of nationwide schooling companies and with the complete settlement of the above companies, the Prefect determined short-term closure of the school from Saturday Might 18, 2024, to Sunday Might 26, 2024 inclusive, to permit all the school buildings to be disinfected and whereas ready for the primary outcomes of the assessments on the tutorial constructing.
Throughout the closure, the top of the establishment and the tutorial crew will permit college students to learn from the continuity of schooling via distance studying.
The Nationwide Training companies talk with the scholars’ households.
A brand new assembly with the prefecture, the regional council, the educational administration and the regional well being group is deliberate for Friday 24 Might to have a look at the scenario because of the newest outcomes.
2024-05-17 20:10:04
#Lacanau #faculty #closed #briefly