A criticism to the Public Prosecutor’s Workplace Salerno and to the Court docket of Auditors to attempt to achieve larger readability on the operation that may rework the world of‘former cement manufacturing unitpresently a paid parking space managed by the subsidiary Salerno Mobilità, in a big tourism hub with the development of two lodges. That is the initiative introduced in a flyer posted in latest days within the space between by way of Mobilio, by way of Guercio, by way of Vinciprova and within the railway station space, following a gathering held final July 21.
The message is signed “responsibly indignant residents”the title chosen by residents and neighborhood committees within the space who took to the sector after the latest sale by the Municipality of Salerno of the event space of Piazza Salerno Capitale, on the mouth of the Irno, “cut up” into two heaps and each offered to an organization owned by the Chechile household (already the proprietor of one other lodge a number of dozen meters away) for a complete of 12 million euros: as indicated by the administration within the tender for the sale of its belongings – a basic lever for submitting down the heavy deficit within the price range of Palazzo Guerra which is relying on the sale of its properties to adjust to the “Save the Metropolis” settlement stipulated with the ministries – on this improvement space they can be utilized to construct constructions meant for tourism resembling, exactly, lodges.
#Salerno #lodge #cement #manufacturing unit #Security #danger
– 2024-07-30 02:43:51