Many Thionvillois came to settle at the back of the sub-prefecture this Wednesday, June 9. They came to observe the work of the companies having started to slide the 140-meter footbridge onto the barge which will bring it, tomorrow, to its final location. The automated maneuvers are done very slowly. It will take a day or more for the 250-ton structure to leave the shore where it was assembled (and also repaired).
Through
Today at 2:00 p.m. – Reading time:
–