President Pietro castle announced this Friday, October 7, that it had ordered the installation of a multisectoral commission, chaired by Ministry of Health (Minsa), for the construction of a vaccine production plant in Peru.
Through his Twitter account, the head of state reported that he signed the Supreme Resolution 019-2022-SApublished today in the newspaper El Peruano, which provides that the commission is installed within a maximum period of 15 days and that the technical report with the actions and guidelines that allow the planning and implementation of the commission itself be delivered in 90 working days . vaccination facility.
“The functioning of the Multisectoral Commission will not require additional resources from the public treasury, and is financed by the institutional budget of the IHigher Institute of Health (INS). It will be chaired by the INS and composed of representatives of the Presidency of the Council of Ministers (PCM), the Ministry of Health and Proinversion.“, indicate.
“We inform the Peruvian people that as part of the General Government Policy 2021-2026, we have as a priority guidelines to preserve life and health, actions to combat the pandemic with preventive measures, care and containment in the face of new risk scenarios.”, Adds the publication.
The president said the government will strengthen the state’s response capacity against epidemics, pandemics and health emergencies throughout the country.