Home » today » Sport » Newly Renovated Stadium: Largest Reform in History, New Entrance, Cafeteria, and Activity Rooms

Newly Renovated Stadium: Largest Reform in History, New Entrance, Cafeteria, and Activity Rooms

The Largest reform in the history of the Stadium since it opened in 1959 has been approached in phasessince November of last year, with the premise of continuing making it easier for its subscribers to practice sports in a unique environment What is the stadium like?

New entrance and cafeteria

The first stage of the work has already been completed with a new entrance, a more integrated, accessible and useful cafeteria terrace. In addition, an area of Shared work and the indoor tennis court where subscribers already enjoy taking their best shots and emulating Rafa Nadal, Carlos Alcaraz or Roger Federer.

photo article-photo-- " wp_automatic_readability="27">

Coworking area created in the remodeled facilities of the Stadium assigned


Definition of the new complex

The works for dispose of Estadio Berria in January 2024 now face the turning point of the second phase that will end up defining the renovated sports complex. The new building, attached to the ratchet, has been consolidated

The less showy and fundamental part of concrete, structure, roof and new slabs has come to an end.

photo article-photo-- " wp_automatic_readability="27">

Next to the old ratchet, a new volume has been generated ARDILUZU


The part begins in which the new rooms begin to be erected and spaces begin to be generated where, not long after, the Stadium subscribers will be enjoying group activities.

New activity rooms

The access from the main building is already outlined with the stairs that will equalize the height with that of the rooms. In this plant, the high intensity interval training slots (HIT) and the future spinning room in stands. The limits of the room are already intuited with the future windows, and the pedestrian access from the walkway over the ratchet stands.

photo article-photo-- " wp_automatic_readability="27">

Future spinning room with built-in stands to teach the class ARDILUZU


Going up the stairs they see the activity rooms (healthy back, yoga, pilates, tai chi, among other). In these spaces it has been wanted enhance the contribution of natural light by installing large windows that make it easy.

At the end of the corridor is prepared the area where the covered and heated walkway will connect the activities building with the main.

Second floor

Through a hole in that wall you access the second floor of the existing building, where the multifunctional room will be which will house the most massive activities of the Stadium. With endowment of stretching area in the old engine room.

photo article-photo-- " wp_automatic_readability="27">

The multi-functional room will house the most massive activities of Estadio Berria ARDILUZU


The roof is now just waiting for the tape and the air conditioning machines and, of course, the solar panels that will help the complex to be as respectful as possible with the environment.

photo article-photo-- " wp_automatic_readability="29">

The roof is already waiting for the record, air conditioning machines and solar panels ARDILUZU


This daily work has the with the objective of ensuring the best possible experience for Stadium subscribers and the commitment that for the next sports campaign, which will begin in autumn, these new spaces can be seen and tested and in January 2024 have everything ready and ready at the beginning of the renewed journey.

2023-06-08 11:00:54
#works #stadium #progressing

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.