German authorities often only approve the operation of wind turbines with the stipulation that certain shutdown times are observed. Standstill rotor blades are intended to protect bats or birds, for example, and thus avoid a violation of the prohibition of killing under species protection law.

On May 19th, 2021, the Higher Administrative Court of Berlin-Brandenburg decided that these shutdown times were incidental provisions. These can be challenged in isolation by the operator of the system with a lawsuit. Review So far, the OVG Berlin-Brandenburg had assumed that the arrangement of shutdown times in an approval notice meant that the approval granted was only valid for a limited period from the outset. It had … … More: Original press release prometheus

Keywords:
prometheus, lawyer, law firm, energy law, shutdown, species protection, nature conservation, wind power plant, bat, bird, shutdown time


SHARE IT!












Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.