Home » News » “New Easy Toll System Implemented in Lion Rock Tunnel, Hong Kong”

“New Easy Toll System Implemented in Lion Rock Tunnel, Hong Kong”

Lion Rock Tunnel, Lion Tunnel

The Lion Rock Tunnel implemented the “Easy toll” non-stop toll at 5 a.m. this morning. Some drivers failed to adapt to the new arrangement and slowed down or even stopped at the toll booth. The staff had to remind them to move on.

The Lion Tunnel implemented temporary traffic arrangements on Saturday night, and the direction to and from the Lion Tunnel and related branch roads were once closed from 4:30 to 5:00 this morning for the final preparations for “Easy Traffic”, including closing some traffic lanes, using black Cover the toll booths with cloth, remove the “Autotoll” automatic payment signs, etc. Luo Shupei, Director of Transport, also visited the site.

The Lion Rock Tunnel is the third government tunnel toll area to implement “Easy Travel”. Earlier, Tsing Sha Control Area and Shing Mun Tunnel implemented “Easy Travel”.

Originally published on AM730

2023-05-28 03:12:11
#ETrafficLion #Tunnel #continue #driver #parking

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.