The Missionary Institute of Drinking water and Sanitation (IMAS) will have an influence on the execution of the city crossing of the Jardín América which will be carried out on the countrywide road n. 12.
IMAS will act in the enhancement of the challenge jointly with the Provincial Road Path (DPV) in the construction of the ancillary infrastructures that will consist in the extension of the ingesting water pipeline in the route among the purification plant and the reserve station.
As regards the technical details: “The assignments will consist in the alternative of the existing asbestos cement pipe with a pipe built in HDPE PN 6 and PN10 with a diameter of 500 mm and a size of 6 km with the relative extras”, specifies the engineer Osvaldo Mayo, who, as the agency’s organizing director, attended the general public listening to that took position this 7 days in the Auditorium of the Jardín América Public Expert services Cooperative.
This preliminary intervention by IMAS will be decisive for the development of the track which will begin in the past months of the recent yr.
–