Modern high-speed turnouts transported from Austria in special Switcher wagons have been delivered to the Central Railway Main Line.
The unloading took place on the night of 27/28 May. According to the company, KZN Rail, a company belonging to the Group, was responsible for carrying out the logistics campaign. Switcher wagons were used for transport, enabling safe transport of turnout blocks while maintaining the highest quality of the initial construction.
High speed turnouts are a key element of the infrastructure of the most important railway line. Exactly on January 9, approx. At 21.30, on the Central Railway Line in Pilichowice, two cars from the technical depot of the PPM-T company belonging to PKP PLK fell off the track. The event damaged two turnouts and about 200 meters of track. Even then it seemed that restoring full functionality of the line could take several months. An even more dangerous situation, fortunately without consequences, occurred at CMK at the beginning of May, when the train driver of IC Silesia managed to brake the train right in front of a group of workers.
2023-06-02 09:55:15
#High #speed #turnouts #delivered #CMK