In the village of Svisloch in the Pukhovichi district of the Minsk region, power engineers restored heating after an accident on one of the heating mains as a result of the intervention of builders.
The welding work was completed on November 26 at 00:30, and at 04:00 the network section was put into operation so that the heat supply was fully restored.
“According to updated information, as a result of damage to the pipeline by a third party, consumers were left without heating and hot water supply: in the village of Druzhny – a clinic, a hostel, in the village of Svisloch – a hospital, a kindergarten, a school, 74 residential buildings,” said the Ministry of Energy.
Earlier, Telegraf reported that the Ministry of Energy claimed that heat supply in Svisloch was disrupted due to an emergency in the neighboring village of Druzhny. There, while carrying out excavation work, workers from a “third-party organization” damaged the main network water pipeline with a diameter of 400 mm.
How do you like the news?