The suspension of electric fluid will be from 8:30 a.m. to 6:00 p.m. at Carrera 25 with Calle 55, in The Andes; from 11:30 a.m. to 6:00 p.m. at Carrera 43 with Calle 55, in Boston; from 7:30 am to 11:20 am at Carrera 44 with Calle 53, in Rosario.
In the municipalities, for their part, network adjustments will be made from 8:00 am to 5:00 pm on Calle 35 with Carrera 30, in the neighborhood La Arboleda, from Soledad; from 8:00 am to 5:00 pm in malambo in the 1D race with 43B street, El Concord; and from 8:50 a.m. to 6:00 p.m. in sectors adjacent to the pumping station highway, in Palma de Varela.