The European Bank for Reconstruction and Development (EBRD) can provide ‘Ukrzaliznytsia’ with a loan of up to 180 million euros to finance the purchase and installation of equipment for small gas generators with a total capacity of up to 270 MW.
‘In the current crisis situation caused by the war in Ukraine, the urgent capital investment program, which includes the supply and installation of up to 270 MW of small-scale generation capacity, will help the company solve the problem of energy shortage and a To ensure a continuous energy supply for the population and companies,’ says the bank, conveys the economic truth.
It was clarified that the stations will be placed on various existing UZ objects throughout Ukraine, which will help solve the problem of energy shortage and ensure continuous energy supply.
According to the documents, the total cost of the project is estimated at 248 million euros.
The project has currently passed final review and board approval is expected on December 4th of this year.
Get access to the fresh news channel 112.ua