Urban hygiene:
This morning the shovels will be working in the Obligado and América neighborhoods, the mini Iron will be working in the Chapero neighborhood in the afternoon; and the tractor with trailer will be on Bv. Constituyentes to the West.
Grass cuttings:
In the morning they will work in the squares of the Hospital, Moreno and San Jerónimo neighborhoods; the paper mills will be on 131st Street between Olessio and Route 11.
In the afternoon, the Malvinas Heroes will be on the road.
Road maintenance:
The motor grader works on the road to Correntoso.
Drains:
The backhoes are working on changing pipes at the intersection of sewers at Constituyentes and Brown; placing pipes at the northern entrance to the city; and the backhoe is working on ditching on 57th Street in Olessio to the east.
Pre-molded:
Tile reinforcement for Microcentro in Municipal Workshop.
Flooring:
Pothole preparation and concreting is being carried out at 27 de Abril and Pietropaolo.
Masonry:
We work in the banks of the Luján neighborhood.
Hydraulics:
Work is underway to install water tanks in the Lorenzón/Los Ándes neighborhood.
Patching:
Patching work is being carried out on 27 de Abril between Pietropaolo and Ireneo Faccioli, and on San Martin between Gral. López and Iriondo.
Smithy:
Assembly of railings at the Municipal Workshop and placement of floors and railings on the bridge over Arroyo San Javier.