Home » World » Collection, cleaning and repair work for Monday, September 16

Collection, cleaning and repair work for Monday, September 16

Urban hygiene:
They begin with the tasks of Clean Patio Zone E and F corresponding to the neighborhoods within the 4 Boulevards, La Cortada, Ombusal and Las Ranas.
This morning the shovel will work in La Cortada, Ombusal and Las Ranas, the backhoe will work on Independencia Boulevard to the south and the trucks will work on 9 de Julio to the west and Habegger to the south.

Grass cuttings:
Morning shift:
Clearing and weeding of the paths around the Plaza in the Zorzón neighborhood and on 131st Street in the Asunción neighborhood. The pulp mills are working at the Municipal Campsite.

Afternoon shift:
Clearing/weeding of pedestrian path on 119th Street of Route A009 to the west, 44th Street of 105 to the south, and the paper mills will work in Loteo Báscolo.

Drains:
This morning, ditching will be carried out in the Unidos neighborhood and pipe lifting will be carried out in the Obligado neighborhood.

Pre-molded:
Armor in Municipal Workshop.

Flooring:
Pothole repairs are being carried out at Pietropaolo and 27 de Abril.

Masonry:
Placement of benches in the square of Puerto Reconquista.

Hydraulics:
Placement of water tanks in the Lorenzón/Los Ándes neighborhood; repair of a water valve in the América neighborhood.

Patching:
Pothole repair work is being carried out in a 314-home neighborhood.

Smithy:
Installation of floors and railings on the bridge over Arroyo San Javier.

Today, Monday, remember to take out your household waste, always separating the bags of organic, inorganic and sanitary waste.

Also, keep in mind that the mechanical sweeper works on streets in a North-South direction.

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.