Home » today » News » Check the streets cut by the Half Marathon this Sunday in Valencia | Radio Valencia

Check the streets cut by the Half Marathon this Sunday in Valencia | Radio Valencia

Valencia will celebrate this Sunday the 30th edition of the Valencia Trinidad Alfonso-EDP 2021 Half Marathon, a popular race that will have about 13,000 participants who will cover just over 21 kilometers. This tour will affect traffic in the city between approximately 07:30 and 11:45. Avenida de los Naranjos, where the test starts, will be closed from Saturday afternoon.

According to sources from the organization, there will be three outings of about 4,300 participants in each of them, at 08:30, 08:50 and 09:10; and the forecast is that the last runner passed the finish line around 11:45 am.

As for the itinerary, which will begin in Avenida de los Naranjos, it will pass through Luís Peixó, Marí Blas de Lezo, La Serrería, Ibiza, Menorca, Paseo de la Alameda, Plaza de Europa, Avenida de Francia, La Plaza Zaragoza, the streets of Pla del Real, San Pío V, Trinidad, Santa Rita, Almassora, Platero Suárez, Ruaya, Reus, Joaquín Ballester, Avenida de Pío XII, the Ademuz bridge, the Gran Via Fernando el Catolico, Ramón y Cajal, Jesús, Guillem de Castro, Xàtiva, Colón streets, Navarro Reverter avenue, Flores bridge, Menorca street, Las Baleares avenue, Joan Verdeguer street, Ingeniero Manuel Soto avenue, the Plaza de la Armada Española, de la Reina and Avenida de los Naranjos direction V21.


Plan streets affected by the Valencia Half Marathon / Valencia City Council

On Friday, October 22, from 4:00 p.m., the parking area of ​​Avenida de los Naranjos, between Ramón Llull and Ernest Lluch streets, will be occupied in the direction of the beach, using a traffic lane for safety during the assembly of the pre-goal zone.

On Saturday 23, from 4:00 p.m., Avenida de los Naranjos will be closed in both directions, from the Mirador roundabout to the roundabout with Engineer Fausto Elio and Luís Peixó, for the assembly of the starting and finishing arches. This closure will remain in effect until Sunday, which is calculated to open around 5:00 p.m. in the direction of the V-21, and around 7:00 p.m. in the direction of the beach after cleaning and removal of the corresponding elements.

Already, on Sunday 24, the traffic cuts during the test will take place from 07:30 hours and the opening of the same will be done progressively according to the passage of the participants.

The tram, as it passes through Avenida de los Naranjos, will also be prevented from circulating from 07:20 to 09:28 on the same Sunday.

These are the alterations of the EMT lines this Sunday

Due to the traffic cuts, on Sunday from 7:00 a.m. to 12:30 p.m. the EMT lines will alter their service. Users can consult all these detours on the EMT València website, App and social networks.

In addition, on Saturday from 4:00 p.m., due to the assembly tasks, the route of lines 18, 40, 71, 93 and 98 will be slightly modified.

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.