Home » today » News » Causes for MBZ Toll Roads going up and down to save lots of prices revealed at trial

Causes for MBZ Toll Roads going up and down to save lots of prices revealed at trial

Jakarta

session an alleged corruption case within the Jakarta-Cikampek (Japek) II toll highway building venture, aka the MBZ elevated toll highway 2016-2017 will quickly enter a brand new part, the place the general public prosecutor (JPU) will learn the fees for the 4 defendants on this case on July 10, 2024. Within the case- final legislation it was revealed that the MBZ toll highway part was performed on objective. up and down to save lots of building prices and construct effectively.

This was revealed by defender Tony Budianto Sihite. Tony is the staff chief of the design advisor PT LAPI Ganesatama Consulting and the proprietor of PT Delta International Construction on the MBZ Toll Highway building venture.

Tony is the defendant examined as a crown witness within the trial of alleged corruption for the MBZ Toll Highway building venture on the Jakarta Corruption Courtroom, Wednesday (3/7/2024).

“On some sections of toll roads, some toll roads go up and down. Clarify the fundamental explanation why some sections of toll roads go up and down, sir, ” requested Tony’s lawyer through the trial.

Tony mentioned his celebration obtained a doc containing a primary design drawing of the MBZ Toll Highway, which was made up and down from PT Jasamarga Cikampek Flyover (JJC). He mentioned that it was his celebration’s responsibility to design the MBZ toll highway in order that automobiles may go it at a velocity of 80 km/hour although a number of sections had been made up and down.

“So our curiosity is how we design it, in order that it nonetheless goes up and down at a velocity of 80 (km/h). So the form is up and down. Here’s a doc from the employer, from JJC. the second is how we design it, that’s “This up and down may be very protected at a velocity of 80 (km/h). So there aren’t any accidents and so forth,” defined Tony.

Tony then revealed the explanation why a number of sections of the MBZ toll highway had been made up and down. He mentioned this was performed to save lots of growth prices and effectivity.

“So the context of ups and downs is a context that was set out from the start by JJC, at the moment, so far as I do know, the aim was to save lots of or cost-effectiveness, on this case. That is it, sir,” mentioned Tony.

Learn extra on the following web page.

Watch DetikPagi Reside:

(hear/hear)

2024-07-04 00:22:59


#Causes #MBZ #Toll #Roads #save #prices #revealed #trial

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.