Home » World » Caggiano, work begins on the Massavetere bridge

Caggiano, work begins on the Massavetere bridge

Starting tomorrow morning, Wednesday 27 November, along the state road 19TER “Dorsale Aulettese”construction work will begin at the bridgeMassaveaters’, a Caggiano. In detail, for the execution of the lifting activities of the work’s decks – necessary for the replacement of the supports – until next December 19th transit will be prohibited stretch of state road 19TER between km 9.090 and km 9.168. The circulation of vehicles with a length of less than 10 meters will be diverted along the state road 19 “of Calabrie” and the regional road 94Awhile longer vehicles will have to use theA2 “Mediterranean” motorway.

Stop for the holidays

During the Christmas holidayswork will be interrupted in order to leave the infrastructure usable. Then, starting from January 7th, activities will resume to allow the completion of this intervention, with the lifting of the two remaining spans. Finally, starting from tomorrow, the alternating one-way system active between the bridges will be removed.Ficarola’ e ‘Calabria‘, thanks to the completion of the main part of the new paving activities carried out by Anas; to follow, the definitive signage will be completed.

#Caggiano #work #begins #Massavetere #bridge

**Recognizing the impacts on daily life, what specific mitigation strategies will⁣ be implemented ​to minimize disruption for residents​ and‌ commuters during the bridge closure, particularly those reliant on public ⁢transportation?**

## World Today News Exclusive Interview: ⁣Caggiano⁤ Bridge ‌Reconstruction

**Introduction:**

Welcome⁣ to ⁤World Today News. Today, we’re diving into the upcoming construction work on ⁢the Massavetere‌ bridge in Caggiano, impacting traffic along state road 19TER “Dorsale Aulettese.” ⁣ We have⁢ two esteemed guests‌ joining ⁤us: [Guest 1 Name and Title, ideally a local official or transportation authority representative] and [Guest 2 Name and Title, ideally a representative from a local business or community group].

**Section 1: The Need for Reconstruction**

**(To Guest 1):**

* The article mentions the bridge decks need ⁣replacing. ‍Could you elaborate on the⁤ condition of the Massavetere bridge and why this reconstruction is necessary? What risks were posed by the⁢ old bridge?

**(To Guest 2):** This bridge is vital for⁣ connecting [mention communities or businesses impacted].​ How will this reconstruction project⁣ affect local businesses ‍and⁤ the ‌daily lives of residents?

**Section 2: Traffic Management and​ Detours**

**(To Guest 1):**

* ⁤ The article outlines ⁢specific detours. Can you walk us through the⁢ alternative routes for vehicles of different sizes? What ⁣measures‍ will be​ in place to ensure smooth traffic flow during the closure?

**(To Guest 2):** Are ⁣there any​ concerns within the community about the proposed detours, particularly for longer vehicles or those unfamiliar with alternative routes? How can communication be improved to ensure everyone is informed and prepared?

**Section 3: Holiday Pause and Completion**

**(To Guest 1):**

* The project pauses during the ⁣Christmas holidays. What factors led ‌to this decision, and how will this break impact the overall​ project timeline?

**(To Guest 2):**⁣ How do you anticipate the community reacting to the temporary suspension of work during the holidays? Will this provide sufficient relief for businesses and residents during⁢ a busy period?

**Section 4: Long-Term⁢ Benefits and Future Projects**

**(To Guest⁤ 1):**

*⁣ What ‍are the ⁤long-term benefits of‌ this reconstruction ⁢project? Will it increase‍ safety, improve ​traffic⁤ flow, or contribute to the region’s infrastructure in other ‌ways?

**(To Guest 2):**

* Are there any​ other infrastructure projects planned for this region? How can these projects benefit the ⁤community and​ address potential future challenges?

**Conclusion:**

Thank you both for joining us today​ and shedding light on this important project. We hope this discussion has provided‍ our viewers with a⁣ better understanding of the⁤ Massavetere bridge reconstruction ‍and its ⁢implications ⁣for the Caggiano community.

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.