Baden-Wuerttemberg
Problem solved: S-Bahn timetable is further interrupted
09/12/2022, 09:32
–
Stuttgart (dpa / lsw) – On Monday morning, due to an airline breakdown, Stuttgart’s S-Bahn trains failed completely or partially for about six hours. According to a spokesman for the railways, the failure of the airline was repaired around noon. However, all affected lines only run every 30 minutes for the rest of the day because the vehicles and railway personnel are not at the scheduled locations and still had to be dispatched. The accident occurred around 5:30 am According to information, railways S1, S2, S3, S4, S5, S6 and S60 are affected.
–