Home » News » B 182 Brennerstraße will open again from today, Friday, 12 noon

B 182 Brennerstraße will open again from today, Friday, 12 noon

The wood and rock clearing work and the renewal of all traffic control systems on the B 182 Brennerstraße since March 8, 2021 have progressed quickly. For this reason, Brennerstrasse can be opened to traffic again today, Friday, 12 noon. After a landslide, a single-lane road layout with traffic lights will only be set up in a small sub-area for two to three weeks, which is still necessary for the final clearing and renovation work.

After the snowy winter, urgent renovation measures were required on Brennerstrasse. This included the removal of damaged wood and unstable trees as well as the replacement of rockfall walls. In addition, loose rock and rubble were cleared from steep slopes on the mountain side and some traffic control systems were completely replaced. In order to be able to carry out the renovation work as quickly as possible and thus to keep the roadblock as short as possible, this work was also continued over the weekends.

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.