Home » Technology » Artemis I: two cancellations afterwards, NASA does not anticipate a new day for the launch of the mission to the moon

Artemis I: two cancellations afterwards, NASA does not anticipate a new day for the launch of the mission to the moon

The launch of NASA’s new SLS lunar rocket will not take place in the subsequent number of times, the US room company announced right now, devoid of offering a new day for the operation.

The start period of time that ends on Tuesday “is no for a longer time on the desk,” mentioned Jim Cost-free, head of advancement of NASA’s exploration methods, quoted by Agence France-Presse.

The upcoming start periods, established by the positions of the Earth and the Moon, run from 19 September to 4 October and from 17 to 31 Oct.

Fifty many years soon after the very last Apollo mission, Artemis’ new central program must permit it to establish a human existence on the Moon, enabling it to be utilized as a “springboard” to Mars.

For the next time in a lot less than a 7 days, the launch of the new rocket was postponed now because of to a fuel leak, the US place company announced.

“The Artemis I mission to the moon was postponed. The groups tried out to fix an problem relevant to a leak in the ‘hardware’ that was transferring gas to the rocket, but they couldn’t,” NASA stated on Twitter.

This is the second postponement of the start of the examination flight of the new rocket, unmanned, possessing been canceled on Monday because of to complex challenges.

The start, now devoid of an declared date, marks the commencing of the Artemis lunar program, with which the United States intends to return to the floor of the Moon in 2025, a yr following the predicted, putting the very first woman astronaut and the 1st black astronaut on the ground. lunar.

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.