United Arab Emirates: Two bridges on the way to reduce visitors congestion in the town of Ajman. Ajman Municipality has declared that building of the bridges will be finished by October future 12 months. Two bridges are underneath construction on Al Ittihad Street in Ajman.
Etihad Street is an place of Ajman that swells with traffic to and from Dubai and Sharjah. The Etihad Avenue Bridge will have 3 lanes for automobiles coming from Dubai. Under the bridge, traffic will be controlled by highway indications at the intersection connecting Al Ittihad Street and Kuwait Road.
One more bridge will also be designed for those heading from Al Hassan bin Al Haitham Road outside the emirate and Ajman industrial area in Sharjah. This challenge is in the second package of the proposal of Sheikh Humaid Bin Rashid Al Nuaimi, ruler of Ajman. As part of the construction of the bridge, there will be traffic restrictions in this spot.
There are 5 parallel lanes from Sharjah to the Sheikh Khalifa intersection and two parallel lanes to Al Nuaimiyah. Ajman Municipality Organizing Department Director General Abdurrahman Muhammad Al Nuaimi warned that motorists must pay back consideration to targeted visitors control and route alterations.
–