Home » News » Marne – Practical information – Weather, pollution, traffic from November 4 in Reims

Marne – Practical information – Weather, pollution, traffic from November 4 in Reims

What should you expect from Monday November 4? Essential information to plan your day in Reims and its surroundings.

Temperatures, air quality

On the other side of Halloween, it’s sunny, but the temperatures remind us that winter is coming!

The sun will rise at 7:39 a.m. and set at 5:19 p.m. Temperatures will fluctuate between 4°C in the morning, 13°C in the afternoon before falling to 8°C in the evening.
Humidity will be 80% for a precipitation rate of 2%, depending on Weather France.

As we return from a long weekend where human activities were limited, combined with light wind and low temperatures, the formation of ozone and the accumulation of atmospheric pollutants are contained. The air quality index is mostly good in the Grand Est region and locally average, with PM2.5 particles as the majority pollutant, according to Atmo Grand Est.

Traffic and works in Reims and its surroundings

REIMS

• Rue Robert de Coucy: before the renovation of the Place du Chapter, an archaeological excavation is underway and should last 2 weeks, until November 18.
• Rue des Telliers: as part of the works on rue Noël, traffic will be prohibited between rue de Talleyrand and rue des Telliers until November 11.
• Rue Magdeleine: Securing bus stops for 4 weeks, until November 15.
• Rue Louis Pasteur: Following the renovation of rue André Ampère, work will be carried out on rue Louis Pasteur between the Parant establishments and avenue Maurice Plongeron, until the end of November.

• Rue de Nanteuil, renovation of the roads and the low voltage electricity network, until the end of December.
• Rue de Neufchâtel: several interventions are planned on the gas pipes and water networks until the end of December.
• Rues de Talleyrand and Gambetta: Work on the Voie des Sacres and the arrival of High Level of Service Buses (BHNS) until the beginning of 2025.
• Creation of a dedicated BRT route on the Venice – Marchandeau – Wilson – Barthou – Louvois – Châtillons – Cormontreuil axis until December 2024.

SURROUNDINGS

• Taissy, Rue du Mont Gélus: renovation of the drinking water network for 5 weeks, until November 19.
• Mailly-Champagne, rue Félix Faure and rue Jules Ferry: renovation of the drinking water and sanitation networks for 12 weeks, until the end of December.
• Châlons, avenue du Général George-Smith-Patton: Works and requalification until early 2026. More information here.
• D210 between Chavot Courcourt and Monthelon: works in both directions due to deformed road surfaces, until December 31, 2024.
• Epernay, expansion of the scope of work relating to the redevelopment of the Charles-de-Gaulle esplanade until December. More info here.
• Châlons: an 18-month project on the south wing of Place Foch in the city center. Some disruptions to expect.

Sending your photos

To image this section, we always call on your photos of the region and we invite you to send them to this address: [email protected].

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.