Home » News » Inexperienced mild from the inspection commissioner for the longer term Montpellier Western Bypass

Inexperienced mild from the inspection commissioner for the longer term Montpellier Western Bypass

vital
A positive opinion was given relating to the distributions vital for the development of those 6 km of two × 2 tracks between Juvignac (A 750) and Saint-Jean-de-Védas (A 709).

Introduced as a public utility in September 2021, the Montpellier Western Bypass (COM) goals to improve the prevailing axis of about 6 km between Juvignac and Saint-Jean-de-Védas to 2x lanes 2. The purpose will probably be to attach the A750 within the north with the A709 within the south.

The State has named the Autoroutes du Sud de la France (ASF) because the concessionaire for this work. The corporate is accountable for the undertaking administration of this work with a delegation from the State.

On this context, and to permit him to determine on the feasibility of the land vital to hold out the work of COM, the senior officer of Hérault opened a public inquiry that lasted from April to Might 2024.

This public inquiry made it potential to find out the boundary of the out there property, to attract up a plot plan, to determine a listing of properties and holders of actual rights associated to the extraction and at last to determine the opinions of the homeowners and collect everybody. folks involved in regards to the course of.

“Greater than 53% of the plots have been acquired”

It befell within the cities of Montpellier, Saint-Jean-de-Védas and Juvignac, those most affected by the undertaking.

Vinci remembers that the method is what ASF desires “change and negotiations resulting in a good and amicable settlement with affected website homeowners. At this level, it’s remembered that two thirds of the rights of approach are public. that the negotiation route is greatest. So far, greater than 53% of the plots have been acquired.”

“With this info and after hearings, conferences and discussions, the Audit Commissioner gave a good opinion on this vital stage of the work, which is remembered to be desired by greater than 86% of the inhabitants of the western a part of town ​​of Montpellier (IFOP survey September 2023). “

2024-07-20 01:10:32
#Inexperienced #mild #inspection #commissioner #future #Montpellier #Western #Bypass

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.