Home » News » Hill! 16 BUMN Obtain State Capital Injection of IDR 44.24 Trillion, Right here Are the Particulars

Hill! 16 BUMN Obtain State Capital Injection of IDR 44.24 Trillion, Right here Are the Particulars

Jakarta

The DPR VI Fee along with BUMN Minister Erick Thohir mentioned the 2025 state capital participation (PMN) for 16 BUMN. The PMN utility was accredited for IDR 44.24 trillion.

The PMN fee of IDR 44.24 trillion is based on the advice of the Ministry of BUMN.

“The Fee VI DPR RI obtained an evidence and accredited the PMN proposal for Fiscal Yr 2025 from the Ministry of BUMN,” stated the Deputy Chairman of the Fee VI DPR RI M Sarmuji in a working assembly with the Minister of BUMN Erick Thohir, Wednesday (10/7) . /2024).

Earlier than it was demolished, every group gave notes. The Indonesian Democratic Get together of Battle (PDIP) group had rejected PMN’s provide for PT Danareksa (Persero) of IDR 2 trillion and Perumnas of IDR 1 trillion.

“We reject PMN’s 2025 proposal for 2 BUMNs. First, PT Danareksa, we imagine that PT Danareksa can get funding in different kinds outdoors of PMN. The second is PT Perumnas as a result of the enterprise mannequin and the clear design idea,” stated Member of Fee VI DPR RI Fraction PDIP, Harris Turino.

Nevertheless, ultimately the PMN was accredited with the be aware that the BUMN Minister ensured that the PMN was used productively, successfully and effectively to enhance the efficiency of BUMN companies in step with the ideas of Good Company Governance (GCG).

The next 16 BUMNs will obtain PMN for the fiscal 12 months 2025:

1. PT Hutama Karya (Persero) IDR 13.86 trillion to proceed development of phases 2 and three of Trans Sumatra Toll Highway (JTTS).

2. PT Asabri Rp 3.61 trillion for capital enhancements.

3. PT PLN (Persero) IDR 3 trillion for town’s electrical energy program.

4. PT Bahana Pembinaan Usaha Indonesia (Persero)/IFG IDR 3 trillion to strengthen the capital of KUR.

5. PT Pelayaran Nasional Indonesia (Persero) or PELNI IDR IDR 2.5 trillion for the provision of latest ships.

6. PT Bio Farma (Persero) IDR 2.21 trillion for brand new capex amenities.

7. PT Adhi Karya (Persero) Tbk IDR 2.09 trillion for the development of Jogja – Bawen and Solo – Jogja toll roads.

8. PT Wijaya Karya (Persero) IDR 2 trillion to enhance capital construction.

9. PT Len Industri (Persero) IDR 2 trillion for upgrading and growing manufacturing capability.

10. PT Danareksa (Persero) IDR 2 trillion for enterprise improvement.

11. PT Kereta Api Indonesia (Persero) or KAI Rp 1.8 trillion to get a brand new practice set for presidency assignments.

12. PT Rajawali Nusantara Indonesia (Persero) or ID Meals IDR 1.62 trillion for working capital for the CPP program.

13. PT PP (Persero) IDR 1.56 trillion for completion of Jogja – Bawen and KIT Subang tasks.

14. Perum DAMRI Rp. 1 trillion for the availability of electrical buses and the renovation of pioneer transport buses

15. Perumnas Rp.

16. PT Industri Kereta Api (Persero) or INKA Rp 976 billion for the manufacture of KRL trains.

(assist/hns)

2024-07-10 15:06:30


#Hill #BUMN #Obtain #State #Capital #Injection #IDR #Trillion #Particulars

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.