THE LAND OF LINZ. The state of Higher Austria is as soon as once more utilizing the summer time months to improve the highway infrastructure. Within the Linz-Land area, there will likely be building websites within the communities of Traun, Wilhering, Ansfelden, St Florian and Niederneukirchen.
This 12 months there will likely be shoveling, digging and sweat on 83 summer time building websites in Higher Austria. “Throughout the vacation season there will likely be as much as 25 per cent much less visitors on the roads. We wish to use this degree to effectively improve roads and bridges,” stated State Transport Councilor Günther Steinkellner.
They attempt to maintain building instances as quick as attainable and due to this fact decrease any delays in journey time, which is why work can be carried out on weekends and at night time. Nevertheless, the deliberate completions are topic to building progress and the climate.
Main renewal of the B1 within the Traunerjunction space
Building work is required on the Trauner intersection because of the poor situation of the highway within the B1-Wiener-Straße space (gap, spalling, cracks within the community). The underside and prime will likely be up to date over two weekends throughout the summer time holidays (most likely in July). Site visitors on the B1 within the intersection space will likely be quickly restricted to 2 lanes.
One-way management on Traunuferstraße in direction of A1
Between July and September, the Selzthal tub on the L563-Traunuferstraße in Ansfelden at kilometer 7,200 is to be renovated. Because of the state of conservation, intensive concrete repairs need to be carried out on the partitions. On the identical time, they wish to improve the bicycle and pedestrian bridge. Native diversions and one-way guidelines (just one lane in direction of A1 / Hornbach) are required.
Reconstruction of bus bays within the Ufer space of Wilhering
Within the Wilhering district of Ufer there will likely be a building web site on the B129-Eferdinger-Straße in July and August: the bus bay will likely be rebuilt and a crossing help will likely be constructed, and the bottom and floor may even be renewed. A bottleneck is predicted halfway whereas the bus bays are being constructed.
Two summer time building websites on the L564-Wolferner-Straße
The renewal of the L564-Wolferner-Straße from kilometers 12,500 to 13,490 (Niederneukirchen metropolis) is required in July because of the poor situation of the highway. Site visitors by means of the Ruprechtshofen space is manually regulated and stopped alternately.
As well as, the L564-Wolferner-Straße within the space of the Enzing intersection in St. Florian will likely be rebuilt. The intention is to extend visitors security within the affected area. Right here too, visitors will likely be managed manually and stopped alternately throughout renovation work (July to August).
2024-06-17 20:17:28
#Summer time #building #websites #Renovation #LinzLand #space #July #September