Home » News » Problematic social construction sites in Mangistau named

Problematic social construction sites in Mangistau named

photo from the meeting

news-id-117271" style="display:inline;">As part of the implementation of the corruption risk map, a total of 156 problematic social facilities were identified throughout the republic, for which the commissioning deadlines were violated, of which there are 11 facilities in the Mangistau region, namely:

– reconstruction and construction of an intra-village water supply system in the village of Zharmysh;
– construction of a sewerage system in the village of Shetpe (2nd stage);
– construction of a water supply system to the microdistrict. Merey in the city of Zhanaozen;
– construction of a water treatment plant and intra-village water supply;
– construction of a secondary school in microdistricts 18 and 19 A of Aktau;
– construction of a central regional hospital in the Munaylinsky district;
– construction of intra-microdistrict highways of the Shygys-2,3 metro station in Aktau;
– reconstruction of the highway “Jyngyldi-Shayr-Sherkala”;
– reconstruction highway “Shetpe-Kyzan”;
– lighting of the Aktau – Fort Shevchenko highway (14-28 km).

“The progress of the implementation of these objects was taken under special control both from the department and from the anti-corrosive volunteers, with the approval by the regional akim of the Plan for completing the construction of problem objects,” they reported at the meeting.

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.