Home » News » “Concreting” Luong Dong River, a business was fined 40 million VND

“Concreting” Luong Dong River, a business was fined 40 million VND

Accordingly, before press information reflected, the delegation inspected tourist areas in the upstream of the Luong Dong River.

Through inspection and comparison of images left before and after the investor rebuilt the embankment along the Luong Dong river, there was cement mortar between the rocks. The authorities found that the current sections of the stream are embanked according to the old embankment foundation before.

However, in some locations, the investor has arbitrarily built embankments encroaching on the river bed, affecting the flow. Specifically, Lai Thieu tourist area has illegally built a cement foundation with an area of ​​150m2; arbitrarily built embankments at 2 locations with an area of ​​153 m2.

Photo" style="" wp_automatic_readability="1.5">

The functional force inspects the “concrete” tourist areas of the Luong Dong River. Photo: DB

With the above behavior, Hoa Vang District People’s Committee has fined Bao An Company Limited (Lai Thieu Tourist Area) 40 million VND. At the same time, ask this company to take remedial measures, return the original status. The time limit for dismantling the embankment construction sites encroaching on the river bed is within 45 days from the date of receiving the sanctioning decision.

Previously, as Dan Viet reported, after receiving press information about the situation of “concreting” in the upstream area of ​​the Luong Dong River, local authorities checked and discovered Cong Loc Phat Upstream Park Co., Ltd. erected canvas tents and engaged in tourism business (upstream area of ​​Luong Dong River), made a record of administrative violations, and suspended all construction and mining activities. waterfall…

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.