The company commented on the information.
– At 17:04 on technological protection, equipment was switched off at CHPP-2, which led to the allocation of the Mangistau power center for isolated operation and a decrease in the frequency at it. According to the automatic frequency unloading, there was a power outage at the consumers of the city and the region. At the moment, there is a phased restoration of the regime of MAEK LLP. Dear residents of Aktau and the region, we apologize for the temporary inconvenience, the company said.
MAEK LLP also reported that hot water supply was cut off and the pressure of drinking water was temporarily reduced in Aktau.
– In connection with the repair work at MAEK LLP, the supply of hot water to the lower microdistricts of the city will be temporarily suspended from 21.00. We inform you that from 22.00 hours the pressure of drinking water will be reduced in the upper and lower zones of the regional center, the company said.
Hot water supply and normalization of drinking water pressure on the city are planned to be tentatively restored by 08:00 April 17.