Ministry started Transport In the installation of the railway flanges on the track of the first line of the electric express train, Ain Sukhna, Alexandria, El Alamein, Matrouh, Fayoum, in preparation for the delivery of the first 40 kilometers of the first line of the express train, to Siemens International Company to make the electromechanical works for the project, as well as the electrical supply network.
The length of the first line of the electric express train (Ain Sukhna – El Alamein – Matrouh – Fayoum) is 660 km and includes 22 stations. New and new cities on the railway network to transport passengers and goods through a fast, modern and means of safe transport, as it will start from the city of Ain Sukhna on the Red Sea coast to the new city of El Alamein, passing through the new administrative capital, the City of 6 October and the city of Burj Al Arab.
The high-speed electric train system will cover all parts of the Republic, as well as be development arteries serving new and existing urban and industrial areas, and will help reduce and shorten commute times between governorates by more than half on time that the citizen currently spends, both through the old railway network and through the current roads that connect the governorates It also serves for the transport of goods between ports and governorates and reduces the period of time for the transport of these goods.
Railway installation on the first line of the electric express train
Start of the railway installation of the first line of the high-speed electric train