Work continues on the construction of the “Peace Walk”, the latest tourist project in Sharm El Sheikh, a 6 km route that allows those who travel along it to see the tourist and recreational landmarks of the city and enjoy its nature.
The project is part of the development work of the city of Sharm El-Sheikh in preparation for the activities of the Climate Conference next month, amid a series of tourism and service projects under development.
Major General Khaled Fouda, Governor of South Sinai, said the project consists of a 6km tourist boardwalk on both sides of Al Salam Road in Sharm El Sheikh, which is part of the Salam Road development plan, and the its expansion to reach 5 traffic lanes, with extension, paving, interlocking works, walkways, lighting, embellishment.
The governor indicated that it includes an iconic gate at the start of the walkway with a height of 7 m and a length of 12 m, and a tourist walkway with a length of 6 km, on both sides of the road, with an average width of up to to 12 m With a width of 7 m, with the realization of landscaping and lighting works, green spaces and flower beds.
He added that the route passes through 83 shops of different sizes, 66 kiosks with an area of 6 m, providing about 600 direct and indirect job opportunities, as well as 57 concrete pergolas, 83 wooden pergolas, about 1,400 various seats, shade plants, and 2,000 decorative columns 3 m high, the recreation area, with 7 m high waterfalls, an open-air Roman theater that can accommodate 350 people, a two-story circular panoramic restaurant, a play area for Kids Arya children, service shops, a pedestrian path, another for bicycles, and parking spaces for 600 cars.
cosmetic work
green areas
Construction of the footbridge in Sharm El Sheikh
Development of the walkway_1
continuous development
Seafront side of Sharm El Sheikh
From the signage of the walkway
From the landmarks of the walkway