It is about the Grzymiszewo bypass.
– At the Voivodship Office in Poznań, we applied for a decision on the permit for the implementation of a road investment (ZRID) for the Grzymiszewo bypass. Obtaining this decision will enable the commencement of construction works. It is the first investment in the province. Greater Poland, implemented under the government Program for the construction of 100 ring roads, for which we applied for a ZRID decision – explains Alina Cieślak from the General Directorate for National Roads and Motorways.
The contract for the design and construction of the route was signed with the contractor in June last year. – The contractor for the investment is a consortium of Polimex Infrastruktura (leader) and Polimex Mostostal (partner). The contract worth over PLN 18 million will be performed within 27 months from the date of its conclusion, excluding winter periods during construction works. As part of the contract, the contractor will prepare a construction design, obtain the necessary decisions, and then build a road. The planned date of putting into operation is the second quarter of 2024 – he adds.
The road will be approximately 1.5 km long. It will bypass Grzymiszew from the south, and then through the roundabout it will join the existing DK72.
–