The Zweckverband Regio-Nahverkehr Freiburg is still dissatisfied with the rail traffic on the east-west axis of the Breisgau S-Bahn. That is why a signature is now initially refused.
There are still problems on the east-west axis of the Breisgau S-Bahn. This was emphasized from many sides at the meeting of the Freiburg regional transport association (ZRF). Although the eight-point emergency program announced in February made some things better, the situation is not satisfactory. Therefore, the region wants to wait with a signature that should formally confirm the fundamental expansion of the Breisgau S-Bahn in the coming years. The current problems must be solved first.
What is already going better?
A main criticism of the past was the omission of stops at the university hospital in Freiburg and at the train station in Eichstetten. In order to make up for missing time or to reach connections, the trains drove past people who were waiting. From ZRF’s point of view, this has become significantly better. When people at the stops Freiburg/Messe, Landwasser and Hugstetten …
–