Budimex will design and build a physical barrier on section no. 1 (section length approx. 54.82 km) and section no. 2 (section length approx. 50.73 km) of the Podlasie Border Guard Unit.
The value of the offer for the episode no. 1 amounts to PLN 167.7 million net, and the value of the offer for the episode no. 2 exceeds PLN 158.5 million net. The works are to be completed within 150 days from the date of signing the contract.
Whereas Unibep, as a consortium leader and its subsidiary Budrex, will design and build a physical barrier on Polish-Belarusian border, in the Podlaskie Voivodeship, on two sections with a total length of 80.7 km.
The price of the bid submitted by the consortium amounts to approximately PLN 197.5 million net, of which the amount of approximately PLN 58.4 million is the remuneration attributable to Unibep, and the amount of approximately PLN 139 million net is the remuneration attributable to Budreks. The declared investment completion date is 150 days from the date of concluding the contract.
–