–
KMS3 will be located in the Louga region and will have a final capacity of 200,000 m3 / d. By 2035, it will have to cover the drinking water needs of the populations of the Dakar region, of the localities crossed by the Lac de Guiers pipeline.
–
> Read the project description
–
–
Related posts:
The cause of the coronavirus infection in Samut Sakhon is declining !!
Thailand has found 369 additional COVID-19 cases; proactive screening in Samut Sakhon Province conti...
Even in moderation, alcohol poses a wellness chance
Combination of Intravenous Ondansetron and Intravenous Glycopyrrolate Versus Intravenous Ondansetron...