The government raises the level of emergency response… Full-scale snow removal work belatedly
Support for snow removal work of about 100 soldiers
[앵커]
Citizens who were using the highway due to heavy snowfall in Yeongdong, Gangwon-do stayed up all night.
Only after the situation got serious, the authorities started snow removal in earnest, and even mobilized soldiers to clear the snow.
Reporter Seung-Hwan Kim reports.
[기자]
The highway on holiday nights, which would normally have been empty, turned into a parking lot.
Cars are stuck in heavy snow.
[고속도로 차량 이용객 : 동해(고속도로) 타라고 해서 탔는데 그럼 제설을 해놔야 할 거 아니에요. 제설 (작업이) 하나도 안됐죠.]
The road was barely made by digging snow between the cars with a shovel, but the car couldn’t go forward with its own strength, and only spins a flat wheel.
The road construction side also guided cars going on the highway in the direction to the national road,
“(Where should I go fast?) It is faster to go to Nene Bukyangyang (Nadeulmok).”
Unlike the road construction guide, the endless congestion continued even at the entrance to the national road.
The government has raised the level of response by raising the emergency response stage to cope with heavy snowfall.
In the Gangwon area alone, more than a thousand people and nearly a thousand vehicles were mobilized.
However, it was not enough to remove all the snow that had already accumulated tens of centimeters.
The cars that were buried in the snow and whine alone are barely moving forward.
Even the soldiers who enjoyed a break in the unit on the day of the March 1st holiday were put in a blitz to clear the snow.
On the last day of the holiday, citizens who stayed up the night while using the highway had a nightmare.
YTN Seung-Hwan Kim[[email protected]]is.
※’Your report becomes news’ YTN is waiting for your valuable report.
[카카오톡] Search YTN to add a channel [전화] 02-398-8585 [메일] [email protected] [온라인 제보] www.ytn.co.kr
[저작권자(c) YTN & YTN plus 무단전재 및 재배포 금지]
– .